Dom z Chin blog

How to Import a Modular Home from China to Poland: Step-by-Step

Our direct-import process typically takes 75 to 120 days from order to handover at Brzozowka.

  1. Week 0: Choose a configuration at the Nordic configurator and send it for a quote.
  2. Week 0-1: Sign the contract and pay the deposit; production starts.
  3. Weeks 1-7: Our partner factory produces the module and sends progress updates.
  4. Weeks 7-18: Sea freight normally takes 45 to 75 days, with shipping milestones shared.
  5. After arrival: We handle customs clearance at the Polish port.
  6. Inspection: The module travels to Brzozowka, where we inspect it and resolve issues before handover.
  7. Handover: You collect it or we arrange delivery to your plot.

Why use a direct importer?

A broker can add another margin and leave you without a direct relationship with the factory. We handle customs documentation, conduct physical inspection and remain accountable for the handover in Poland.

Start your configuration and let us prepare a quote.

Dom z Chin
domzchin.pl

Chinese manufacturing. Polish quality control. Your confidence.

+48 533 337 890

biuro@hmodular.com

Brzozówka, Mazowieckie
(45 km from Warsaw)

Why choose us

  • • Direct import from China
  • • Quality control in Poland
  • • Factory showroom — see the modules in person
  • • Custom timber production available

GSP Sp. z o.o. | NIP 5223086107

Our products are prefabricated spatial modules. They do not constitute buildings under Polish construction law. Formal requirements for placing a module on your land depend on its parameters and local regulations. Our team is available to help determine the requirements for your location.